top of page
FIS Integrity &
Treasury AI Center of Excellence


Interface upgrades for FIS Integrity
Interfaces built years ago still move your money today. We rebuild, re-test and monitor them so an upgrade or a new ERP doesn't break treasury.
Three signs your interfaces need work
Someone fixes it by hand every week
A file gets edited, a job gets restarted, or a statement gets reloaded. Each workaround is a risk and a cost.
Nobody knows how it works anymore.
The original builder has left, the documentation is thin, and every change feels dangerous.
An upgrade is coming.
A new Integrity version, an ERP migration or a new bank channel means existing interfaces must be re-tested or rebuilt.
Interface Upgrades
Scope:
An inventory and health check of existing interfaces, then a rebuild or refactor of ATS jobs, SQL and scheduling. Also covers ERP interface changes (SAP S/4HANA, Oracle, D365), regression testing around upgrades, and error handling and alerting.
Deliverable:
Upgraded interfaces in production with full regression evidence. Includes documentation your team can maintain and monitoring that flags failures before treasury does.
Best for:
Teams facing an Integrity version upgrade, an ERP migration, or a fragile interface landscape built up over the years.
Track record
200+ interfaces built for FIS Integrity. 300+ data sources connected. Production-grade monitoring on systems that move millions every day.
ATS interfaces and scheduled jobs
Jobs and interfaces rebuilt with logging, retries and alerting.
ERP interfaces
GL journal exports and payment and cash forecast feeds. Re-pointed and re-tested when the ERP changes.
Bank interfaces
Moved to new channels or formats, see Bank Connectivity and Payment & Statement Formats.
Market data and compliance feeds
Bloomberg, Refinitiv, MarketMap Rates, sanctions screening and other external data sources.
Reports built on interfaces:
Crystal reports moved to Power BI. SQL datasources on the Integrity database. Building apps connecting with API.
System upgrade on the calendar?
A 30-minute call lists which interfaces are at risk and what it takes to make them upgrade-proof.
Email: peter.quarre@tmsoptimizer.com
Phone: +31 6 30 28 07 09
bottom of page